Minsk
Minsk metro construction pace to accelerate
According to Vladimir Kukharev, the second tunnel-boring shield has already started work on the third metro line. At the same time, design work for the fourth line is underway.
It was also reported that the Timiryazeva interchange is scheduled to be commissioned by the end of this year, while construction of the Vaupshasova Street interchange will begin in 2027.